Mirabel, Team Leduc begins construction of Station 2L
The building, covering 122,190 square feet across six floors and a subterranean level for parking, storage, and a courtyard, will offer 164 apartments in various sizes: 1 1/2, 2 1/2, 3 1/2, 4 1/2, and 5 1/2. Each apartment will
Comments
1 Likes
EHDAA SCHOOL DELIVERY – LAVAL
Laval, September 2024 An Inclusive and Meaningful Project Just before the start of the 2024 school year, Groupe CIBS delivered the EHDAA building to the Mille-Îles School Board. This school was designed to meet the needs of students with disabilities or those